A Goal is the contract layer above tasks. A task says what to change; a Goal says what “finished” means and how it will be proved. The Goals screen describes itself the same way: durable contracts you hand to agents — open one to watch it get built, and act where a gate needs you.

Every task belongs to a Goal (tasks.goal_id is NOT NULL). A new project gets a default Goal named General, and task-creation surfaces attach to it unless you pass a goal_id.

A task list tells an agent what to do next. It does not tell the agent when to stop, what it may not touch, or who decides the work is acceptable. Without those, a long unattended run either stops too early or keeps going past the point anyone wanted.

A Goal carries the four things a task cannot:

  • A verification surface — the check that decides acceptance, declared up front.
  • A stop condition — the sentence that ends the run.
  • Constraints and boundaries — what must not change, and what is out of scope.
  • An acceptance status — whether the evidence has been recorded yet.
FieldPurpose
objectiveRequired. What this Goal is for, in prose.
nameOptional, unique per project. Lets you address the Goal by name.
statusactive, paused, complete, or blocked.
verification_surfaceHow completion is proved. See below. Omit for a Goal with no formal gate.
constraintsWhat the work must not do — systems to leave alone, invariants to hold.
boundariesWhat is in and out of scope, and where out-of-scope work lands instead.
stop_conditionThe sentence that ends the run.
iteration_policyHow many attempts, and what to do when one fails.
budgetThe spend or time ceiling for the Goal.
last_verificationThe most recent evidence recorded against the Goal.

A verification surface is declared when the Goal is created or updated, and the evidence passed to complete_goal must match its kind. The server validates the evidence against the declaration — it never runs a shell command itself.

SurfaceEvidence that closes it
{"kind":"gate_command","command":"pnpm build && pnpm test"}{"kind":"gate_command","exit_code":0}
{"kind":"acceptance_checklist","items":[{"criterion":"…"}]}{"kind":"acceptance_checklist","checked":["item id or exact criterion"]}
{"kind":"human_sign_off"}{"kind":"human_sign_off","approved_by":"…"}

The server returns stable item ids for checklist items, so evidence can reference an id instead of repeating the criterion text.

create_goal({ project_id, objective, name: "client-2026-08", verification_surface })
invoke_goal({ goal_id }) // sets current_goal_id, checks for cycles,
// returns the first frontier todo
get_next_task({ project_id }) // walks that Goal's frontier
complete_goal({ goal_id, evidence })

pause_goal and resume_goal move a Goal in and out of paused. set_current_goal points the project’s current_goal_id at an active Goal, so get_next_task resolves there when goal_id is omitted.

When several Goals are active and none is current, get_next_task cannot choose and says so rather than guessing.

complete_goal fails closed. Four refusals are worth knowing:

ErrorMeaning
verification_requiredThe Goal declares a surface and no evidence was supplied.
blocked_by_incomplete_tasksCycle tasks are still open.
invalid_argument + unmatchedChecklist evidence names criteria that do not exist on this Goal.
invalid_argument + unmetChecklist evidence leaves declared criteria unchecked.

invoke_goal refuses too: it returns no_todo_tasks when every task is still in scope. Releasing scope to todo is a human decision, and no tool self-releases it.

The Factory contract drives Goals as the unit of unattended work: the runner takes cycle tasks to done, runs the declared verification surface externally, and calls complete_goal with the result.

Green evidence completes the Goal. Red evidence sets it blocked and files a scope remediation task named Fix acceptance failure: <objective> — one at a time, so a Goal that fails twice does not accumulate duplicate cards. A failed gate leaves work on the board rather than a silent stop.